Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Steel winning the world's first million-kilowatt power plant boiler direct air-cooled coal-fired units FRAME project
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:

Guangzhou Steel News: Steel winning the world's first million-kilowatt power plant boiler direct air-cooled coal-fired units FRAME project

Time:[2015-8-19]  Hits:4387

Guangzhou Steel News: Steel winning the world's first million-kilowatt power plant boiler direct air-cooled coal-fired units FRAME project

Recently, a heavy steel from Shanghai came the good news, some steel by virtue of outstanding technical support and good processing quality in one fell swoop Shenhua Group, the kingdom of God Yuanyanghu Ningxia Power Plant 2 × 1000 MW ultra supercritical direct air-cooled coal-fired units two boiler steel steel works. The project is the world's first million-kilowatt coal-fired units of Direct Air Cooling Power Plant. Guangzhou Steel

Yuanyang Lake power plant is located in Ningxia Ning Dong Energy and Chemical Base, is the kingdom of God group Ningdong coal bases in the planning and construction of key projects integrated coal. Power Plant Phase II project is one of the countries supporting the planning and construction of power projects in Zhejiang Ningdong ± 800 kV HVDC transmission project, the expansion of the end of a project build two 1100 MW ultra supercritical direct air-cooled coal-fired units, and according to hasten the construction of zero-emission norms synchronization flue gas desulfurization, denitration and efficient dust removal equipment. Now, Ningxia has a safe, efficient, clean, intelligent power plant construction in accordance with the norms, "a gifted two of five demonstration" arrangements completed the preliminary design optimization, planned to June 2017 and in September the two units were put into operation. Guangzhou Steel

Copyright:佛山市beat365官方网站钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号