Language:CHINESESENGLISH

Home > News > Installation of Foshan steel structure may be a problem
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:

Installation of Foshan steel structure may be a problem

Time:[2016-11-4]  Hits:4465

  The city's large buildings are basically applied to the Foshan steel structure of this material, and when we install, you will not encounter the following problems? As a professional manufacturer, today to summarize.
     1, before the professional supervision and supervision engineers to verify whether the basis of concrete strength to meet the lifting requirements, hoisting program is approved, check the site construction personnel and construction machinery is consistent with the post-mortem, hoisting line is consistent with the lifting program, can guarantee the safety of construction .
     2, check the lifting equipment, locking devices, anchor, hanging point, the driver, command, endurance, lifting operations, operating platforms, high operations, component stacking, etc. to meet safety inspection standards and related personnel are present, security There are no warning lines set.
     3, rain, fog, windy weather must prohibit lifting operations.
     4, in the field of Foshan steel welding time to pay attention to check the temporary power distribution circuit layout and configuration of the distribution box to meet regulatory requirements.
     Foshan steel structure that needs to come to win state-steel, currently has large-scale steel structure production equipment and automatic spraying production line, to meet different customer needs. Users are welcome to visit!
Copyright:佛山市beat365官方网站钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号